WhatsApp
Add Rfq Free
Importars Pedido

Bottle And Glass Industry Turn Key Project

General basic requirements.
1. although the plant is to be designed for an output of 60 tons/day molten glass for the first campaign lay-outs of equipment and machinery shall be designed in consideration of future capacity expansion of the plant by at least twice of the same capacity.
machinery and equipment common to both technological capacities shall be provided with adequate capacity right from the beginning.
2. all machinery and equipment should be of the simplest possible, trouble free

Abstracto

Palabras Claves

Sus Otros Peticiones


SEND RFQ

¿Le gustaría enviar este mensaje a empresas más relevantes?